Address 
304 North Cardinal 
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Address 
304 North Cardinal 
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM






Model: BC-003F
Maximum wave height: 2M
Maximum wind speed: 60M/S
Module bracket: PE bracket
Arrangement of modules: 1-2 modules/group
Module tilt angle: 15°
Minimum water level: 0.5M
Support module size width: 1054MM
Floating Solar Farm is an innovative method of generating solar power by mounting solar panels on the surface of a body of water. Such systems are typically installed on artificial bodies of water such as lakes, reservoirs, and aquaculture ponds, and do not take up valuable land resources. Floating Solar Farm’s design allows the solar panels to float as the position of the sun changes, thus maximizing the efficiency of solar energy absorption and conversion. A major advantage of floating solar systems is their cooling effect on bodies of water, which helps to increase the efficiency of the solar panels. The shading of the solar panels also reduces evaporation from the water column, contributing to water conservation. These systems usually do not affect the underwater ecology and can even sometimes provide shade and habitat for aquatic organisms.
| Brand | Wanhos | 
| Material | HDPE, AL6005-T5, SUS304 | 
| Tilt Angle | 15° | 
| Wind Speed | 60m/s | 
| Snow Load | 1KN/㎡ | 
| Water Depth | 200-300mm | 
| Loading Capacity | 150kg/㎡ | 
| Certificate | ASNZS1170/ ISO9001/ SGS/TUV etc. certificates | 
| Lead Time | 3-21 Days(According to the quantity) | 
| MOQ | 1 PCS | 
| Sample | Free samples | 
| Production Capacity | 10MW monthly delivery | 




We support customized packaging to maximize the protection of your goods and hand them over to you in perfect condition.

Generally speaking, express delivery (FedEx, UPS, DHL, etc.) is 6-7 working days after delivery, railway is about 35 days after departure, and sea freight depends on the specific region, but basically takes more than a month.



 COOPERATIVE PARTNER
COOPERATIVE PARTNER
