Floating Pv

Model: BC-003F
Maximum wave height: 2M
Maximum wind speed: 60M/S
Module bracket: AL6005-T5 Aluminum Alloy
Arrangement of modules: 1-4 modules/group
Module tilt angle: 0-15°
Minimum water level: 0.5M
Support module size width: 1303MM

Send Enquiry
Category:

Components of Floating Pv are typically designed to be modular and lightweight for ease of packaging and transportation. The modular design means that the modules can be broken down into smaller units, which makes more efficient use of packaging space and reduces transportation costs. Lightweight materials reduce shipping weight, lowering logistical costs while also reducing stress on the water column during installation. These systems are often designed to be collapsible or removable, allowing them to take up less space during transportation. Such a design not only reduces transportation costs but also makes it easier to deploy the system in different locations, especially in remote areas that are not easily accessible. Floating solar power plants are mounted on water, and they can often be transported directly to the installation site via waterways. This waterborne transportation can substantially reduce the cost and complexity of long-distance transportation, especially for installation sites near rivers, lakes, or coastal areas.

Technical Parameters
Brand Wanhos
Material HDPE, AL6005-T5, SUS304
Tilt Angle 15°
Wind Speed 60m/s
Snow Load 1KN/㎡
Water Depth 200-300mm
Loading Capacity 150kg/㎡
Certificate ASNZS1170/ ISO9001/ SGS/TUV etc. certificates
Lead Time 3-21 Days(According to the quantity)
MOQ 1 PCS
Sample Free samples
Production Capacity 10MW monthly delivery
Float system

floating pv

Introduction to the Float System

Details

Solar Floating Racking System Showcase

Project Reference

floating photovoltaic

Delivery & Shipping

We support customized packaging to maximize the protection of your goods and hand them over to you in perfect condition.

Daily-shipments

Generally speaking, express delivery (FedEx, UPS, DHL, etc.) is 6-7 working days after delivery, railway is about 35 days after departure, and sea freight depends on the specific region, but basically takes more than a month.

About Us

Related Certificates

One-Stop Service

COOPERATIVE PARTNER

cooperative partner

Home
Search